AB News Fire
  • Automotive
  • Business
  • CBD
  • Crypto
  • Education
  • Fashion
  • Finance
  • Health
  • More
    • Entertainment
    • Home Improvement
    • Law \ Legal
    • News
    • Shopping
    • Sports
    • Technology
    • Travel
  • Write To Us
Facebook Twitter Instagram
AB News Fire
  • Home
Facebook Twitter Instagram
SUBSCRIBE
  • Automotive
  • Business
  • CBD
  • Crypto
  • Education
  • Fashion
  • Finance
  • Health
  • More
    • Entertainment
    • Home Improvement
    • Law \ Legal
    • News
    • Shopping
    • Sports
    • Technology
    • Travel
  • Write To Us
AB News Fire
Home»News»Amtrak holiday travel being impacted by storm surge that closed route from Oceanside to Orange County
News

Amtrak holiday travel being impacted by storm surge that closed route from Oceanside to Orange County

By December 21, 2022No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email

[ad_1]

OCEANSIDE, Calif. – Amtrak’s train that runs along the San Diego Coast is going on three months of closure from Oceanside to Orange County and is now impacting holiday travel.

The service from Oceanside to San Clemente was stopped on September 30, 2022, due to a storm surge causing unstable tracks. Construction and stabilization work is underway.

A state transportation emergency was declared in October over the issue.

Amtrak is providing bus service in lieu of the train service between Oceanside and Irvine. On Tuesday passengers told FOX 5 that it is adding an extra hour to their travel time, this holiday season.

“Usually with the train, you board and it’s always on time,” said Celia Chamu, a UC Irvine student who is traveling home for winter break using Amtrak. “I feel like there’s no consistency between the bus and the train.”

“It delays time,” said Josh Madison, a traveler in Oceanside.

“We don’t drive so we don’t have another option, we can’t take a car,” said Leslee Soria, a UCSD student who is traveling with Chamu.


Oceanside named official training ground by USA Surfing

“It’s kind of a really big inconvenience,” Chamu said.

Taxi driver Alberto Venegas said his taxi business has been slower this holiday season than in years past. He believes fewer people are opting to take the train because the closure is creating longer travel times, and in turn, he has less business at transit stops.

“Right now it’s kind of slow for the taxi business,” Venegas said. “Holiday travel should be busy.”

Meanwhile, passengers who will be riding Amtrak for New Year’s Eve travel said they are already planning ahead.

“I’m a little frightened,” Madison said. He is traveling to Los Angeles for New Year’s Eve celebrations. “I’ll probably have to go up like a day or two days before because there’s no telling.”

The Orange County Transportation Authority, which is leading the stabilization work, estimates work will be completed in February 2023.

“We sincerely apologize for any inconvenience this service disruption is causing to our riders. We’re continuing to look for ways to minimize the impact of these closures as this critical work continues,” Amtrak’s Pacific Surfliner page reads on its website.

Suggest a Correction

[ad_2]

Source link

Related Posts

Alaska Airlines adds new nonstop domestic flights from San Diego International Airport

February 1, 2023

One person shot near Fairmount Village park

February 1, 2023

Encinitas makes Forbes list of top travel spots in 2023

January 31, 2023

Comments are closed.

Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Proton EV roadmap – to start with MHEV, then PHEV and BEV; targeting Malaysia as an EV RHD hub

February 1, 2023

2023 KTM 390 Adventure revised, new spoked wheels

February 1, 2023

Perodua has 220k outstanding bookings – will absorb SST for deliveries after March 31, including new Axia

February 1, 2023

2024 Mazda CX-90 debuts – new three-row SUV; 3.3L turbo mild hybrid inline-six, 2.5L PHEV; standard AWD

February 1, 2023
Recent Posts
  • Proton EV roadmap – to start with MHEV, then PHEV and BEV; targeting Malaysia as an EV RHD hub
  • 2023 KTM 390 Adventure revised, new spoked wheels
  • Perodua has 220k outstanding bookings – will absorb SST for deliveries after March 31, including new Axia
  • 2024 Mazda CX-90 debuts – new three-row SUV; 3.3L turbo mild hybrid inline-six, 2.5L PHEV; standard AWD
  • Model hibrid sebenar dari Perodua – bukan Ativa, mungkin Bezza G2 atau Myvi G4, muncul 2024?
Archives
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • September 2021
Facebook Twitter Instagram Pinterest
  • Home
© 2022- AB News Fire- All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.