AB News Fire
  • Automotive
  • Business
  • CBD
  • Crypto
  • Education
  • Fashion
  • Finance
  • Health
  • More
    • Entertainment
    • Home Improvement
    • Law \ Legal
    • News
    • Shopping
    • Sports
    • Technology
    • Travel
  • Write To Us
Facebook Twitter Instagram
AB News Fire
  • Home
Facebook Twitter Instagram
SUBSCRIBE
  • Automotive
  • Business
  • CBD
  • Crypto
  • Education
  • Fashion
  • Finance
  • Health
  • More
    • Entertainment
    • Home Improvement
    • Law \ Legal
    • News
    • Shopping
    • Sports
    • Technology
    • Travel
  • Write To Us
AB News Fire
Home»Automotive»EV charge point operators recommended to get EV charging system licenses before March 31, 2023 – EC
Automotive

EV charge point operators recommended to get EV charging system licenses before March 31, 2023 – EC

By December 19, 2022No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email

[ad_1]

The Energy Commission (EC) has recommended that charge point operators (CPOs) involved in the development of electric vehicle charging infrastructure are to immediately obtain a valid public energy distribution license for the installation of EV charging systems (EVCS) by March 31, 2023, Bernama has reported.

Electric vehicle charging system (EVCS) licenses are to be obtained by charge point operators, including for EV charging systems already in operation, before enforcement is carried out, the Bernama report cited a statement by the Energy Commission as saying, and which added that the license must be applied to ensure that charging systems are standardised and safe throughout the country.

“This requirement is in line with the provisions of Section 9(1)(b) of the Electricity Supply Act 1990 (Amendment 2015) (Act A1501), which states that licences shall be issued to charge point operators conducting electricity supply activities for commercial purposes for 10 years, depending on the installation location,” the statement read.

However, the scope of the Energy Commission licensing only covers safety and technical aspects, and does not cover economic regulatory policy, it added.

Charge point operators carrying out charging system installations without a valid licence are committing an offence, and may be prosecuted under Section 37(5) of the Electricity Supply Act 1990 (Act 447), according to the statement by the EC.

The recently opened Gentari electric vehicle charging hubs at the Bangi Golf Resort and at X Park Sunway Serene in Petaling Jaya were the first EV charging sites to receive the Electric Vehicle Charging System (EVCS) licence from the Energy Commission.

At the official opening of the Gentari charging hub at the Bangi Golf Resort, the location was presented with its public energy distribution license from the EC to EV Connection (EVC). The EV charging hub in Bangi is co-developed by EVC and Gentari, a subsidiary of Petronas; the license is to ensure the safety of the facilities’ structure and operations.



[ad_2]

Source link

Related Posts

Proton EV roadmap – to start with MHEV, then PHEV and BEV; targeting Malaysia as an EV RHD hub

February 1, 2023

2023 KTM 390 Adventure revised, new spoked wheels

February 1, 2023

Perodua has 220k outstanding bookings – will absorb SST for deliveries after March 31, including new Axia

February 1, 2023

Comments are closed.

Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Proton EV roadmap – to start with MHEV, then PHEV and BEV; targeting Malaysia as an EV RHD hub

February 1, 2023

2023 KTM 390 Adventure revised, new spoked wheels

February 1, 2023

Perodua has 220k outstanding bookings – will absorb SST for deliveries after March 31, including new Axia

February 1, 2023

2024 Mazda CX-90 debuts – new three-row SUV; 3.3L turbo mild hybrid inline-six, 2.5L PHEV; standard AWD

February 1, 2023
Recent Posts
  • Proton EV roadmap – to start with MHEV, then PHEV and BEV; targeting Malaysia as an EV RHD hub
  • 2023 KTM 390 Adventure revised, new spoked wheels
  • Perodua has 220k outstanding bookings – will absorb SST for deliveries after March 31, including new Axia
  • 2024 Mazda CX-90 debuts – new three-row SUV; 3.3L turbo mild hybrid inline-six, 2.5L PHEV; standard AWD
  • Model hibrid sebenar dari Perodua – bukan Ativa, mungkin Bezza G2 atau Myvi G4, muncul 2024?
Archives
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • September 2021
Facebook Twitter Instagram Pinterest
  • Home
© 2022- AB News Fire- All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.